The present project deals with attitude dynamics and control of reconfigurable spacecrafts.
本项目研究了可重组航天器的姿态动力学与控制问题。
Concrete vertical transportation, eccentricity control of pier top and construction of top hat beam are the difficult points for present project.
混凝土的垂直运输、高桥墩顶偏心控制、帽梁施工是该工程施工的难点。
This article simply introduces control method measure about type glass curtain wall glass computation in present project, construction and project quality.
简单介绍现在工程中对点式玻璃幕墙玻璃的强度验算、钢结构剂玻璃的施工工序及目前工程中质量的检测控制手段。
应用推荐